Run hundreds of screens from one dashboard
Naming, screen groups, roles and scheduling: the setup that keeps a large network under control from head office.
Start with a naming convention
Before pairing the first screen, decide how screens will be named. A pattern such as City – Outlet – Position (“Pune – Baner – Counter”) makes every list, filter and report readable at a glance. Changing names later across hundreds of screens is painful.
Build screen groups that mirror your organisation
Create groups for the ways you actually publish: by region, by city, by store format and by screen position. A screen can belong to several groups, so a counter screen in Baner can receive the national menu, the Pune offer and the counter-only promotion.
Give each team the rights it needs and no more
Head office marketing publishes national campaigns. Regional managers publish to their region. Outlet managers update local notices on their own screens. Set this up with permissions per module and, on larger networks, custom roles.
Asset visibility controls keep regional files out of national libraries, and “uploaded by” tracking shows who added each file.
Plan content on a calendar, not on the day
Set a default playlist for every group, then layer scheduled campaigns on top by date range and daypart. Preview each slot before publishing. Holiday and festive overrides should be planned at the start of the quarter.
Check network health every morning
Make one person responsible for a short daily check: which screens are offline, since when, and in which outlets. Most offline screens are a switched-off TV or a loose cable, and the outlet can fix it in a minute once someone calls.
Review monthly
Once a month, review uptime by region, outlets that are often offline and content that has run too long. Retire old assets so the library stays clean as the network grows.


